Principles of Management and SAD Questions and Answers

Principles of Management and SAD Questions and Answers in the form of MCQ / objective types. Various aspects of principles of management and system analysis design are covered under the following questions.
1) A programmer would most likely prepare a
  1. General System flowchart
  2. Specific system flowchart
  3. General program flowchart
  4. specific program flowchart
Show Answer
Answer = specific program flowchart
2) Rapid prototyping proves the quality of design by?
  1. Having a program simulate the real system
  2. Having the system analyst present an overview of the design to users,programmers and cosultants
  3. Having a data flow diagram
  4. Both A and B
Show Answer
Answer = Having a program simulate the real system
3) User friendly computers have ensured that ?
  1. Management requires no system analysis and design
  2. Programmers are no longer needed
  3. Structured programming is not needed
  4. None of above
Show Answer
Answer = None of above
4) A system analyst design a new design by ?
  1. Identifying sub system and interfaces between sub system
  2. Adopting a developed system to the present environment
  3. Developing a system as a large, single unit
  4. Propose alternatives to the current system
Show Answer
Answer = Identifying sub system and interfaces between sub system
5) Which of the following might be output as a result of using a CASE tool?
  1. Programming code
  2. Flowchart and adopt flow diagram
  3. Prototype and cost/benefit analysis
  4. All of the above
Show Answer
Answer = All of the above
6) The first items defines for the new system are ?
  1. Inputs
  2. Outputs
  3. Storage
  4. Processing
Show Answer
Answer = Outputs
7) Announcement of MIS implementation is made by ?
  1. Operational level managers
  2. Tactical level managers
  3. The president
  4. All of the above
Show Answer
Answer = All of the above
8) In data flow diagram, an originator or receiver of data is usually designated by ?
  1. A circle
  2. An arrow
  3. A square box
  4. Rectangle
Show Answer
Answer = A square box
9) The first step of implementation phase is ?
  1. Implementation planning
  2. Select the computer
  3. Announce the implementation project
  4. Prepare physical facilities
Show Answer
Answer = Implementation planning
10) A feasible document should contain ?
  1. Project name
  2. Problem description
  3. Feasible alternative
  4. Data flow diagram
Show Answer
Answer = Data flow diagram

For More Questions visit Here -